Road Paint

Info
AlloyMtd DJ Road Paint offers a c old applied system and is environmentally safe and non-toxic (lead free) with VOC compliant. It is suitable to be applied on bituminous and concrete pavements, which can be sprayed using either airless or conventional spray equipment. It is formulated for a wide range of applications from streets & highway marking, sidewalk and parking lots to even out curb paint.
Features
  • Quick drying and allows immediate road access to traffic, within 1 hour of completion (at 25°C).
  • Excellent adhesion and durability.
  • Enhances visibility of preferential lanes.
  • No thinning required.
Specification
  • SIRIM Testing – MS 164:2007
  • Volume: 18L or 5L/Pail
Technical Data
No Of Components :  : One
No Of Coat :  : 1-2 coat
VOC Content :  : <5%
Density :  : 1.1122 g/ml
Drying Time At 25C (No Dilution) :
:
No-Pick-Up : 5 - 10 minutes
Hard Dry : 15 – 20 minutes
Theoretical Coverage (2 Layers) :
:
Pavement: 1 L/m2
Concrete: 0.5 L/m2
SRV  : 60 (45 Min.)
Shelf Life
Best used within 6 months of delivery but usable within 1 year minimum in an unopened container stored at 25o C.
Note: When storing partially filled containers, always ensure that the containers are sealed tightly. Avoid storing the product in outdoor storage and protect it from freezing.

ADDRESS

FACTORY
Lot. 19, Lengkongan Sultan Hishamudin, 
Kawasan 20 PKNS Industrial Estate, 
Port Klang, 42000 Klang, Selangor, Malaysia.
T. +6 03-3176 2490 / 5822

Email: acpdmtsales@eastrock.com.my

Visitor Counter

0.png0.png5.png8.png4.png3.png3.png